Abstract

ABSTRACT The uncertainty and dynamic changes in assembly resources can seriously affect the normal operation of the assembly plant. In response to the problems of incomprehensive resource control mechanism, poor timeliness of monitoring data, and low level of scheduling intelligence in the assembly plant, a dynamic scheduling and perception method of assembly resources based on digital twin is proposed so that the uncertainties in the assembly process can be monitored and dealt with in time. In this paper, a dynamic scheduling model of assembly resources based on a digital twin is constructed, and the operation mechanism of assembly resources in the constructed digital twin model is expounded. And the dynamic perception method of assembly resources based on the Petri network is studied in detail, and the perception and interaction models of four assembly resources in the product assembly process are constructed: workpiece, handling equipment, assembly center, and storage area. Finally, combined with the assembly workshop of enterprise A’s frame factory, the Petri network model is simulated with the help of the CPN Tools simulation tool to obtain real-time and simulation data such as assembly resources and workstation operation time are obtained, which provides a scientific basis for the smooth implementation of enterprise assembly plan and dynamic scheduling of assembly resources.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.