Abstract

Dynamic rescheduling of workshop production management, with the feature of combinatorial computation complexity, is an important and difficult research area, and be of significant importance for the dynamic scheduling problem. An improved Contract Net Protocol (CNP) with the global two-way, Multi-Agent System (MAS) based communication model, which incorporated the local autonomy of working mutually in consultation by negotiation, is presented in this paper. Furthermore, the simulation results in dynamic scheduling accompanying with its perturbation show that the proposed model and the algorithm are effective to the dynamic scheduling problem in manufacturing system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.