Abstract
Aiming at the problem of overlapping execution of coupling activities in the product development process, using Markov Chain method to describe the iterative process of coupling activities based on the design structure matrix (DSM). Then introduced the information output, input time factor matrix and rework risk matrix to describe the complex information interaction between design activities, constructed a model of rework time caused by design activity coupling and iteration by quantifying the overlap of design activities, and then established the entire project time cost model for coupled activity sets. Finally, an application analysis was performed with examples. The research shows that this method can effectively reduce product development time and provide a certain theoretical basis for the rational planning and scientific guidance of the overlapping execution mode of coupled activities in the product development process.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: DEStech Transactions on Computer Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.