Abstract
Double hanging point hydraulic hoist is widely used in the opening and closing of the gate, and the double cylinder synchronous system is the most important part in the hydraulic system. In this paper, first of all, the principle of control synchronization of electro-hydraulic proportional speed control valve is introduced, then the operation mode of hydraulic synchronous system is analyzed. Finally, the control strategy of electro-hydraulic proportional speed control valve based on fuzzy PID control is presented, and its analysis and simulations are carried out. The simulation results show that the fuzzy PID can achieve the control precision of the synchronization system, whose effect is better than the traditional PID control.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.