Abstract

According to the problems that there are less distribution transformer state variables and the condition assessment of distribution transformer carry out difficultly, a method of distribution transformer condition assessment based on core state variables is presented. The initial results of distribution transformer condition assessment are obtained by using core state variables. Then through calculating the sensitivity of the non-core state variables to the evaluation results, the initial assessment results are modified to ensure more accurate results.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.