Abstract

Abstract In this paper, the overall architecture design of the platform is proposed, and the data architecture and business architecture of the platform are discussed. On this basis, the logistics path planning method of digital collaboration is proposed, including the aspects of path demand splitting and distribution vehicle spatio-temporal network, and the demand splittable logistics path planning model is considered. Finally, the simulation of the workshop logistics dynamic scheduling example is designed, and the dynamic scheduling optimization results are analyzed and verified. The results show that: through optimization, its time penalty cost f 1 = 801.38, the total distance traveled by the delivery trolley f 2 = 1709m, and the total distance of empty load is 692.15 m, and the dispatching scheme increases the distance of empty load by 59 m . The research results of this paper can provide a reference for digital management and collaboration platform for civil aircraft manufacturing enterprises and provide a reference for research in related fields.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.