Abstract
Fixed-price contract is usually adopted for EPC-type project, the abbreviation of Engineering-Procurement-Construction. It is commonly appreciated that fixed-price contract will present more risks to general contractor, in particular when EPC project is implemented, which engages a long process of construction. It is crucial to evaluate properly these cost risks in order to identify proper measures to control them. Considering the characteristics of EPC project, an integrated research method is adopted to evaluate cost risks. Checklist method and expert investigation method are used to identify cost risks in EPC project. The expert scoring method and entropy-weight calculation method are used to evaluate the cost risk factors by presenting relative individual risk factors. ABC classification method is taken to rank the risks according to their importance. The analysis results by using these methods help identify effective corresponding strategies to reduce cost risks in the process of implementing EPC project. The evaluation results on the key cost risks can help general contractors better plan risk management measures in their practice.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.