Abstract

Limited by weight and volume, the transportation and on-site installation of steel bifurcation in the diversion system of pumped storage power station have become a big problem in the construction of the project. According to the needs of the installation and construction of large 800 MPa steel bifurcation in the complex environment, combined with the characteristics of the transportation and installation in the tunnel, the unloading of steel bifurcation is carried out by using the bridge crane between the installation of underground powerhouse. The hoisting up-anchors and sliding trolley arranged in the tunnel are used to place and install the steel bifurcation, which solves the difficulty of hoisting and installing the large turnout pipe in the tunnel and has positive significance in saving the project cost and reducing the construction risk. In this paper, the construction technology of steel bifurcation is described under the complex conditions in pumped storage power station. Detailed description of steel bifurcation construction layout, assembly, site transportation and installation and other construction points, provide a feasible idea for the development of other similar projects.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.