Abstract
This paper presents the stress and strain distribution and change during the tunnel construction, and the stress and strain are compared with different construction methods. Mathematical model was firstly introduced. Then the stress and the strain during the up tunnel construction from two methods were compared. The historical stress and strain curves of key node of tunnel during the tunnel construction were analyzed. The different stress changes from different construction methods were compared. We can get the conclusion that the construction method affects the stress distribution and change.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.