Abstract

As a new type composite structure, concrete fill steel column has a good performance and is widely used in super high rise building. However, concrete pouring and quality control are challenges all the time. Combining with actual engineering projects, this article analyzes key and difficult points existing in concrete filled steel column construction and explores construction in different aspects like selection of construction method, simulated column construction and main construction method introduction. Hoping this article has some help for the similar projects later.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.