Abstract

The construction of tunnels is often long and deep buried tunnels, and the geological conditions are more complex. Based on Jianshan tunnel in Gansu Province, the special geological conditions such as high ground stress and weak interbedded surrounding rock make the excavation of tunnel easy to produce large deformation. In this article, the software finite difference software FLAC3D was used to establish numerical models and select the best construction method by comparing the deformation of the tunnel under different construction methods. Aiming at the deformation characteristics of soft rock tunnels in highland interbedded layers, the control measures of tunnel deformation are discussed. Mainly consider the two aspects of the bolt support plan and the second lining construction time, comprehensively compare the deformation characteristics of the tunnel, and select the best working condition. The research results show that the combination of three-step temporary invert method and three-step ultra short bench method is recommended for the tunnel construction; when the bench length is 4 m, the deformation control effect of the tunnel is the best; by improving the length and angle of the anchor rod, the deformation of the tunnel can also be well controlled.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.