Abstract

The top surface of the hise rise buildings are very small for working space. The findings of this research is to clarify the scientific and technological problems to assemble big steel tower in different shapes on the top of the skyscrapers to the height of dozens of meters safely by using simple mechanical equipment including hoist, hydraulic jack by gradual erection method.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call