Abstract

Geological structure is an important factor to explore the underground geological conditions for hydrogeological purpose. Borehole density has great influence on the accuracy and application of geological model. In this paper, Transition Probability Geostatistical Software (T-PROGS) has been used to simulate the four facies distribution of West Liao River Plain. And a quantitative uncertainty model of entropy method is introduced. For getting a reliable geological model with as few as the boreholes, two parts have been given. One is the vertical lithologic variability analysis, and the other is the model correct rate and uncertainty analysis. In geological modeling, the borehole data is too sparse to characterize the lateral heterogeneity, so the actual profiles are added. At last, many equal probability realizations of the geological model using 350 boreholes are built. Depending on the model calibration, uncertainty analysis and simulated profile comparison, the geological models are reliable. Thus, for the simple and single stratigraphy study area without complex fault structures and graben structures of several thousands to tens of thousands of square kilometer scale, establishing a reliable geological structure model requires one borehole at least within an average area of 120.81 km2. It is of great significance for decision maker to save manpower and material resources. And we present a workflow to build a 3D Markov chain using boreholes and actual profiles and develop a reliable geological model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call