Abstract

Aiming at the problem of the large number of devices and no backup in the intelligent substation monitoring system with the measurement and control devices configured at intervals, a new system architecture of the intelligent substation monitoring system is proposed. The article adopts the method of intelligent control to realize the accurate triggering of the data signal in the test process. The test system automatically captures and parses MMS messages and generates test reports to achieve the optimization of data processing closed-loop testing. Finally, a distributed improvement was made to the traditional centralized construction scheme of urban indoor substations, and the economic benefit analysis proved the scientific and economy of the new scheme.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call