Abstract
Aiming at the problems of high mining intensity and difficult roof management in a fully mechanized mining face with an ultra-high mining height of 8.8m, this article predicts the pressure parameters and rules of the working face based on the roof management technology of the 12402 fully mechanized mining face in Shangwan Coal Mine. The selection of the working surface bracket and the on-site roof safety management system are explained and analyzed. The results show that the analogy method can be used to predict the mining pressure parameters and rules of the working face to meet the needs of the application of large mining heights; the conventional techniques such as forced caving, “Scraped roof support moving method” and “Advanced drawing support method” are still effective under the condition of 8.8m mining height. The roof safety management system formed during construction guarantees the safe and efficient production of the ultra-high mining height working face, and provides a reference for the popularization of the mining technology of ultra-high mining height.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.