Abstract

After the research of schedule problem of one kind of flexible motorcycle assembly lines, a kind of parallel conveyor belt flow shop schedule model using JIT (just-in-time) is given. The impacts of the different max process paces of different work pieces in different stations are considered. Besides, some actual situations, including unstable information and structural constrain, are also considered. Then a kind of improved artificial fish swarm algorithm based on polar coordinate coding is presented to optimise this schedule model. Lastly, this model is tested with the real data from two motorcycle assembly lines, and the result shows that the total production fee is reduced.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.