Abstract

The development of railway high-speed passenger traffic in Russia under conditions, when the construction of a high-speed line is still at the stage of justification, is an actual and rather difficult task, requiring a thorough feasibility study. This task is sometimes even more complicated than the construction of a new line for the implementation of high-speed traffic, as it requires taking into account a large number of factors, for example, procedure of construction work at a large number of separate points with track development, even small ones, of intermediate stations and divert stations. As a suggestion, the authors review, as an alternative to reconstructive measures, the principle possibility of using detours for the passage of high-speed passenger trains, which in practice are often used for transit traffic organization, more often freight traffic, less frequently – passenger traffic. Previously proposed typical schemes of the conversion of intermediate separate points with track development for high-speed passenger traffic are being analyzed; conclusions about the possibility of using bypass lines instead of reconstruction are being made. The article may be useful to specialists, who make researches in the sphere of high-speed passenger traffic organization from the point of view of preparation of existing highways in general, and railway stations in particular.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.