Abstract
Digital mockup of segment erector has been built in PRO/E and imported into ADAMS through Mechanism/Pro for building the virtual prototype. Step function is applied for fitting the segment erector’s main drivers, single segment erected time in Qinling tunnel is calculated as an example, the dynamic simulation of segment erecting under different operating conditions has been made. Comparing the analyzed results then the loading condition of the erector's bridge can be gotten. The finite element analysis of the erector's bridge is made by software ANSYS, structure strength checking which can provides support for the optimal design of segment erector has been made.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.