Abstract

The construction industry as a significant part of national economy, develops in the direction of accomplishment of the purposes and matters of the state development, connected with improving of the Russian economy competitiveness (first of all, due to the increase in its efficiency) as well in the direction of the digital transformation. The solution of the digital transformation issues in the industry as well as the increase in the efficiency of investment-and-construction projects implementation is in the plane of implementation and distribution of the technologies of information modeling (BIM). In spite of the fact, that orientation for BIM at the national level was chosen in 2014, the industry still shows the signs of unavailability to mass transition to BIM; that is connected with some problems and obstacles. The authors of this article conducted the research in the form of poll, directed to identification of such factors and their importance. 180 respondents (representatives of the enterprises and organizations, authorities, professional associations, whose activity is connected with the implementation of investment-and-construction projects, became the participants of the research. During the processing of the research results the hypothesis was made, that the type of activity of the organization has an impact on its assessment of the importance of the factors, interfering BIM implementation. The purpose of the analysis, which results are provided in this article, was the verification of this hypothesis. The conclusion is drawn on the basis of the received results, that the type of the organization activity has an impact on its assessment of the importance of factors (problems), interfering BIM implementation. Thus, the hypothesis of the research was confirmed. At the same time, it was revealed, that the respondents from the Universities group highly appreciate the problems and obstacles of BIM implementation most of all, in comparison with other participants. The respondents from the Investors group, on the contrary, are inclined to a lower estimate of the problems importance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.