Abstract

Suction jet scheme has brought forward sediment suspension transport work parameter in the scheme of water and sediment transporting and sediment adding in discharge water before the flood season of Xiaolangdi Reservoir. Suction jet system starts suspended sediments as per 1 natural bottom slope of Xiaolangdi Reservoir while jet pump eject muddy water, which forms into density current and transport forward, and makes longitudinal deposition in the process of sediment transport. Transport distance shall be 1,264~1,903m while 50% longitudinal attenuation of sediments as effective transport distance. Bottom slope of sediment deposition is reduced to 6.7 with obscure longitudinal attenuation of sediments and can transport to longer distance.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.