Abstract

DC power grid has received increasing attentions recently, and with it comes the demand for highly reliable and stable metering solutions. At present, in the DC distribution projects that have been implemented, some DC metering devices have been put into use. However, from the national and industrial level, there is no clear standard for the design of the metering scheme for the medium and low-voltage DC distribution network, and there is a situation of imperfect metering device configuration. Therefore, based on the analysis of DC metering devices, algorithms and location selection, this paper takes the Hangzhou Jiangdong flexible DC distribution network as an example to analyze the error distribution caused by metering algorithm selection and device configuration. In addition, the influence of harmonics on DC measurement is analyzed to provide the suggestions for DC measurement solutions. The analysis has been verified by MATLAB/Simulink, which provides references for DC metering standards.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.