Abstract

In order to protect environment, the end-of-life product should be disassembly and recycled. While selective disassembly method can be used to separate the valuable parts from the old product and used for reuse or remanufacturing. Usually there are several feasible disassembly sequences for operation; the optimal sequence is decided by operation cost. A fuzzy cost model is presented instead of the traditional quantitative cost model. The advantage of this method is that the detailed information of the end-of-life product is not needed and, the practical feasibility of selective disassembly is improved.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.