Abstract

With the advancing development of structural performance and construction techniques, continuous concrete box girder bridges have been widely used due to their advantages including their broad applications, good appearance, and reliable structural safety. However, as the bridge span and its construction demands are increasing, the bridge construction process tends to be more complex. Especially, the construction methods and bridge installation sequences of cantilever bridges not only exert structural internal force on the bridge construction process but also affect the internal force and line shape of the bridge structure of finally constructed bridges. Hence, it is essential to realize bridge construction control. Only in the presence of the excellent construction control performance, can the structural safety in the bridge construction process can be ensured while meeting the designed requirements of bridge line shapes and internal forces of constructed bridges. In this research, by taking the Weihe grand bridge located at Shandong Province, China as construction background, the specific targets and methods of bridge construction control were introduced for the reference of bridge construction and research.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.