Abstract
With the rapid urban underground rail development, a considerable number of cities bridges face the impact of the MTR. The subway construction through the city bridges lead to a considerable degree of subsidence, deformation, cracks and even a partial collapse, severely affected the bridge function. As the Beijing Subway Line 10 passing through Xinxing Bridge for the study object,the author set up the health monitoring index system of the subway construction through the city bridge, and analyses the monitoring data and the impact for the processing of subway construction across the bridge.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.