Abstract
The global integration time step of multi-scale model is subject to local detailed model, resulting in lower computational efficiency. Mixed time integration method uses different integration time-step in different scale model, it can effectively avoid the above problem. Rest on a large-scale water tunnel under construction, in order to achieve the synchronization of the global and the local simulation, the paper establishes multi-scale finite element model of the tunnel, and calculate it by mixed time integration method. The final calculation and analysis show that the algorithm can guarantee the computational accuracy of multi-scale numerical simulation, and can effectively improve the computational efficiency, it can also provide references for related tunnel project.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.