Abstract
Based on a certain threshold to ensure the durability of structure, the concrete-lined steel pressure pipes used in the structure of large hydropower station widely are allowed to exist in concrete cracking under the action of a certain hydraulic pressure. According to the 1:2 large scale experiment model and the measured data of Three Gorges Hydro-power Station, the existing different methods for calculating crack width were compared and improvements and crack control measures were raised.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.