Abstract

Modong No.4 Bridge is an important part of the water environment improvement project in Guangxi Laibin City, Guangxi. Its site conditions are extremely complex. After extensive research and demonstration, considering safety, practicality, economy, beauty and environmental protection, the design proposal was put forward according to local conditions. Abutment foundation uses ultra-high rigidity to expand deep foundation, which makes foundation pit construction extremely difficult. In order to achieve the optimal implementation of the recommended scheme of the bridge, the key technologies and quality control points of mass concrete foundation construction are studied and put forward. The feasibility of the design scheme is improved to the greatest extent, providing an effective reference for similar bridge construction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.