Abstract

This article makes a brief introduction to the role of intelligent distributed distribution terminal equipment (FA) in low-voltage distribution network, the current construction situation of intelligent distribution network, and describes the FA equipment action test method and the means of joint debugging together with communication equipment. In addition, it points out such practical problems as difficult centralized debugging, poor debugging synchronization, difficult communication joint debugging coordination and the necessity of power outage for re-tests in case of changes in the electric system during integrated automation construction of FTTH distribution station for which a huge number of FA devices are used. Oriented toward the above-mentioned problems and based on the practical situation of project acceptance, this article is aimed at working out a test method for convenient field inspection of the overall action logic of FA device to overcome the current difficulties in the debugging of distributed FA with the concept of “distributed devices, centralized debugging”.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.