Abstract

In the process of reconstruction and expansion of intelligent substation, it is difficult to accurately define the influence scope of SCD file upgrade. In the wake of each modification of SCD file, all configuration information contained in SCD needs to be re-verified, which greatly increases the workload of debugging, operation and maintenance of intelligent substation. Via decoupling SCD files, the problems of modification and re-verification of SCD files in the reconstruction and expansion stage can be tackled. In this paper, SCD precision decoupling method for smart substation with single equipment replacement is proposed, which makes SCD decoupling work more detailed, adaptable to various expansion and technical transformation of substation. The decoupling of SCD is refined from logical structure to physical link level, and the decoupling range of SCD is precisely determined, so as to minimize the modification and reverification range of SCD files and reduce the change risk caused by SCD modification.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call