Abstract
In the case of power interconnection faults such as power lockout, the large-scale power transfer will have a great impact on the stability of the the sending end and receiving end power grid. According to the load regulation demand under the large-scale power gap of the power grid, combined with the adjustment capacity of the thermal power unit, the load target value and the load adjustment rate of the unit are real-time dynamically adjusted with the amplitude change of the grid frequency. The frequency difference is used to reduce the peak frequency of the grid and avoid the occurrence of high-frequency generator-shedding.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.