Abstract

There is different applicable transmission capacity and range between 1000kV and 500kV AC transmission. The traditional method is to use the continuous power flow algorithm by BPA simulation software. But this method is complicated and time-consuming. Calculation is particularly large when electricity has a variety of power demand analysis. This paper presents an algorithm based on the AC line transmission capacity, using MATLAB software programming to achieve the establishment of UHV AC transmission model and economical optimization strategy. The method can use thermal limit, voltage limit, landing stability constraints to get the AC line transmission capacity curve by considering the factor of power network strength. On the basis of this method, an UHV AC transmission model can be built combining with unit capacity annual cost algorithm, which can meet the power transmission of arbitrary transmission capacity and the optimal economic of any transmission distance, has an important reference significance and practical value for the planning and construction of electric transmission lines in China.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.