Abstract

AbstractRelying on the prefabricated construction project of a university in Guangxi, the standardization design of the building structure is proposed for the low standardization of prefabricated building design and serious conflicts in on-site construction, and the reinforced U-shaped ring is especially proposed for the problem of node collision in site construction. Advanced connection technologies such as buckle connection and steel slot connection and new components such as laminated truss floor slabs and corrugated pipe through-hole prefabricated columns. At the same time, BIM technology is used to verify the technical scheme. The result shows: the standardization degree of the integrated design of building structure proposed in the article High, can significantly improve the design and production efficiency, and the use of new connection technology and new components can effectively reduce the collision of steel bars and facilitate construction.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call