Abstract

At present, Hei47 block has already entered high water cut period, and it exists many problems, such as imbalance producing reserves, serious water flooded in main small layer, imperfect injection-production well spacing and so on. Aiming at these problems, this paper analyzed from two aspects of the potential: the first is the potentiality of well pattern thickening which would analyze the reasons of the remaining oil enrichment through four different imperfect patterns, the paper proposes different schemes. For example, this study design new wells in the injection-production incongruous area; As for the area without the control of well net, for example, the study design a horizontal well near the fault where concentrated much remaining oil, and the production conditions are good; The second is making some modification measures in high water cut layer, and perforating other potential small layers, in the light of the wells in low location and is high water cut can be considered to transfer to injection wells. Structural reservoir high-yielding well mainly concentrated in the structural high place, flooded well in the low position, this area is suitable for edge water injection.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call