Abstract

Huoshaoshan Oilfield is a sandstone reservoir with severe heterogeneity. After years of enhanced water flooding, the reservoir conditions have changed greatly. Based on the research results of fine reservoir description, the key to successful industrial application of large-scale water shutoff and profile control is to select suitable water shutoff and profile control agents and improve injection technology and evaluation technology. This technology has become a leading technology for improving water flooding recovery in the development of extra-high water cut stage in Huoshaoshan Oilfield, with remarkable economic benefits. In this paper, the main factors affecting the performance of pre-gel system and the flow experiment used to test its performance index are described by systematic analysis method, and the construction effect of well group H1194 is briefly introduced.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call