Abstract

At present, the important wedge gate valve of the primary coolant system of the CPR1000 nuclear power plant performs preventive disassembly inspection according to the intervals of 5 years, the average dose of a single disassembly is about 10mSv, the average time of each overhaul occupies the critical path is 1 hour, and the valve has been disassembly inspection in good condition. Based on the historical maintenance data, operating environment, failure mode, failure mechanism, operation and maintenance experience feedback of the same type of valve, and failure risk control of the important wedge gate valve of the primary coolant system, this paper demonstrates and analyzes the feasibility of extending the disassembly inspection intervals of the important wedge gate valve of the primary coolant system from 5 years to 10 years. This work plays an important role in improving the economic efficiency of nuclear power plant maintenance and reducing the radiation dose of maintenance.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call