Abstract

Preventive maintenance and rush orders are related. Although preventive maintenance is essential for maximising equipment reliability, it can substantially slow the manufacturing process. Rush order rescheduling involves similar conflicts. Scheduling maintains the robustness of the production schedule, but rush orders require rescheduling. Although preventive maintenance and rush orders are essential manufacturing processes, research on the integration of these functions is insufficient. Unlike recent work that analyses preventive maintenance or rush orders as separate functions, this study proposes an integrated model that analyses both preventive maintenance and rush orders in a two-machine flow shop. The model is then evaluated using two different rescheduling methods. Non-parametric analysis of the models revealed that these two rescheduling methods differ significantly under integrated maintenance and rush order situations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.