Abstract

This paper addresses the risks to delivery schedule and product quality from non-periodic temporal detection of high severity defects in software projects. The non-periodicity in time and lack of a time boundary in detecting severe defects primarily stems from subjective scheduling of development and testing of product features. One solution is to objectively determine complexity and ranking of requirements to drive the project development and test sequence that uncovers high severity defects early in the life cycle phases. Requirements complexity is strongly correlated with defect severity as measurements show. Applying natural language processing, key words are identified in the given set of requirements, their weights measured to determine the complexity class distribution and ranking that drives the scheduling. The complexity and defect correlation-based sequencing mitigates the risks by discovery of high severity defects in a temporal saw tooth pattern providing the project team sufficient time to fix defects and mitigate the risks.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.