Abstract

This paper focuses on repowering options to improve waste conversion efficiency of an existing under-utilized Waste-To-Energy (WTE) power plant with a Gas Turbine (GT). In particular, this study investigates the feasibility of middle pressure repowering strategies utilizing the hot gases leaving the GT. For each investigated repowering option, minimum GT size is identified along with optimum plant match condition in terms of plants capacity. Detailed modifications to the WTE cycle and the resulting enhancement of its performance are presented for both analyzed middle pressure repowering options. Numerical results of a representative mid-size WTE power plant repowered with different GT commercial units are shown and discussed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.