Abstract

A survey of gravimetric work conducted during 1948 and 1949 over the basic gravimetric net-work of 1st and 2nd order on the territory of Czechoslovakia is given. The choice of the gravimetric points, the way of carrying out systematic gravimetric work of basic character and measurements on the gravimetric points are described. Further the joining of the basic network to the pendulum stations, the measurement of the vertical gradient of gravity and other detailed measurements together with various checks on the Norgaard gravimeter used are also described.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call