Abstract

The X-ray Systems Study Group, in an attempt to determine the current status and changes in the state of X-ray equipment, reception systems, and equipment control, conducted investigational research by distributing a questionnaire survey to 400 facilities. The rate of recovery was 33%. The capacity of transformers has been increasing in spite of the three-phase 415 V decrease in the power supply of X-ray equipment. Among high-voltage generators, inverter-type X-ray equipment accounted for 81.3% of units. The ratio of the X-ray tube of a conventional rotational system to that of a high-speed rotational system was 1:3, and 54.9% had target angles of 12 . Many X-ray tubes had a heat capacity of less than 200-300 kHU. The body parts that had the shortest times on radiography were adult chest and pediatric chest. In many cases, the shortest time used was 10 msec. Facilities in which the shortest time was less than 10 msec accounted for almost half of the total number. Facilities where the radiation dose of radiography had decreased showed 1/4 of the digitalization whole. Measurement was carried out when the equipment was bought in 94.9% of facilities, and measurement when the service contract was finished was done in 77.1% of the responding facilities.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.