Abstract

We welcome the comments by D. M. Goldman, J. R. Olsen, and S. K. Nanda of the U.S. Army Corps of Engineers on our analyses of flood trends on the Middle Mississippi River (MMR) and on our assertion that historical stage data can be utilized in flood‐frequency analysis. In some cases, the comments by the Corps authors point out legitimate limitations in the technique presented in our original article—limitations that we also have pointed out (for example, to funding agencies) as directions for future refinement. In other cases, Goldman et al. repeat arguments that have been used for decades to stymie attempts to link river engineering activities to worsening flood behavior. We welcome the opportunity to review these arguments under the spotlight of rigorous analysis. Finally, a major purpose of the Pinter et al. [2001] paper was to show that historical stage data represent an underutilized resource that has promise as a supplement to, and an independent test of discharge‐based, model‐driven analyses of flood frequency.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.