Abstract

This research constructs a mathematical scheme to explore replenishment-shipment decisions for a multiproduct producer-client coordinated finite production rate (FPR) model with the postponement, rework, and subcontracting plan. The considered multiple goods have a common component, and a batch FPR fabrication with postponement is planned to meet the annual multiproduct requirements. The first fabricating phase makes only the standard components needed for a batch and subcontracts a proportion of them (with additional cost) to expedite the process. In contrast, the second fabricating phase produces the finished multiple merchandise in sequence. The in-house rework processes with extra expense help retain the desirable quality. Each merchandise’s finished batch is transported to the clients in equal-sized numerous shipments. This study derives the optimal batch cycle length and transporting frequency by minimizing the overall fabricating-shipment expenses (including clients’ holding costs). This work offers a numerical example demonstrating various crucial system features influenced by the factors of subcontracting, postponement, rework, and transportation policies to facilitate managerial decision making in industries.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call