Abstract

At Philippsburg/Nuclear Power Station the replacement of the feedwater lines (WB35) from their point of entry into the reactor building up to the first external isolation valve of each line brought the quality level of the whole of the feedwater pipe system in the reactor building with basic safety requirements. The design of the new piping was based on a state-of-the-art concept in the mechanical and fluid-dynamics behavior. The extensive analyses focused on the optimization of the closing behavior of the third damped check valves and the integrity analysis of the RPV nozzle. The integrity analysis was performed on the basis of a postulated reliably detectable defect, using the plastic limit load method with the specified yield strength as yield stress. The planning period for preparation of the licensing and approval documents lasted approximately 30 months, following a preliminary concept phase. Replacement was performed in 43 days.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.