Abstract

This paper considers replacement and maintenance policies for an operating unit which works at random times for jobs. The unit undergoes minimal repairs at failures and is replaced at a planned time T or at a number N of working times, whichever occurs first. The expected cost rate is obtained, and an optimal policy which minimizes it is derived analytically. The imperfect preventive maintenance (PM) model, where the unit is improved by PM after the completion of each working time, is analyzed. Furthermore, when the work of a job incurs some damage to the unit, the replacement model with number N is proposed. The expected cost rate is obtained by using theory of cumulative processes. Two modified models, where the unit is replaced at number N or at the first completion of the working time over time T, and it is replaced at T or number N, whichever occurs last, are also proposed. Finally, when the unit is replaced at time T, number N or Kth failure, whichever occurs first, the expected cost rate is also obtained.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.