Abstract

Recent experience from early Swedish BWRs corroborate that all components in a nuclear power plant can be repaired or replaced with new ones. Oskarshamn 1 has gone through a thorough refurbishment project. A number of internals were repaired or replaced including the core shroud support which was welded to the bottom of the reactor pressure vessel. The project verifies that it is fully possible to carry out complicated inspection and repair work inside a nuclear pressure vessel which has been in operation for more than 20 years. Along with increased capacity factor, operating nuclear power plants get the financial conditions needed for extensive repair and modernization projects. Large power output leads to short pay-back times for the investments. The FENIX project at Oskarshamn 1 is such a project. There are utilities whose policy is to keep their plants in as-new condition for an unlimited length of time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.