Abstract

Incorporation of smart-grid technologies (SGTs) in today’s electric distribution networks (DNs) has enabled distribution network operators (DNOs) to have an on-line supervision over the network equipment for optimal operation. This paper proposes a new approach for optimal scheduling of active DNs aiming at minimizing the curtailment power of wind and photovoltaic (PV) units as renewable energy sources (RESs). This purpose is fulfilled by minimizing the imported power from the transmission network resulting in maximization of renewables usage and minimization of power loss. The conducted approach is based on dynamic line rating (DLR) and dynamic network reconfiguration (DNR) as flexibility options. A convex formulation is employed to incorporate the objective function and constraints into a mixed-integer quadratically-constrained programming (MIQCP) model which is solved by global optimum solvers in GAMS. The proposed model is applied to the IEEE 33-bus system under different case studies, and the simulation results are analyzed. The obtained results indicate that the maximum scheduling of wind and PV units’ is fulfilled with the minimum energy losses. By the aid of DNR and DLR in a coordinated manner, the renewables scheduling is increased by about 64% while the energy loss is reduced by 29% compared to the base case.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.