Abstract

At the SMARTY-22 conference, a review of the regenerative methods development was presented, including its application to the study of a non-renewable k-out-of-n system. This paper develops the previous study for the renewable k-out-of-n system, including an investigation different preventive maintenance strategies based on the system state observation. We also include the review of Smith’s regeneration idea development. Some new results are presented that form the basis for an algorithm for comparing preventing maintenance strategies with respect to the maximization of the availability factor. A numerical study was conducted for the 4-out-of-6 and 4-out-of-8 models. The study demonstrates the sensitivity of decision making to the shape of the repair time distribution.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call