Abstract

We examine the impact of the interest rate and its characteristics, such as long run mean and instantaneous variance risk (VR), on renewable energy investments in the power sector. The model has stochastic electricity price, stochastic interest rate, and variance regime switches. We show that an increase in the interest rate, while generally increasing the value of a power project, can have a non-monotone effect if the subsidy is sufficiently large. VR increases (reduces) the project value in the high variance regime, if the subsidy is sufficiently large (low). Under a fixed price contract, value declines and it is optimal to delay investment following an increase in the interest rate. The model helps to explain the US offshore industry experience in 2023.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.