Abstract
In this work, we aim to contribute to the modeling and the optimization of the energy production. In order to minimize the production costs, the quantity of the available green energy in the power system. The model is implemented under the GAMS 24.7.1 environment and was validated by using CPLEX.The presented model can easily combine different sources of energy, by scheduling the resources with high performance and flexibility. This optimization of production cost is applied in a real case, the cost can be reduced by 38% in winter and by 40, 89% in summer.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.