Abstract
A monitoring campaign in a horizontal subsurface flow constructed wetland under the influence of transient loads of flow-rate, organic matter, nitrogen and suspended solids showed an irregular removal of COD and TSS and lower both removal efficiencies and mass removal rates than the ones observed in other studies for similar operating conditions. This circumstance is associated to the presence of large amount of particulate organic matter from non-point sources. The mass removal rate of ammonia increased 39% as both the water and soil temperatures increased from weeks 1-8 to weeks 9-14. A good correlation between mass load and mass removal rate was observed for all measured parameters, which attests a satisfactory response of the bed under to transient loads.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.